Warehouses, shops, kitchens and plants
Commercial & Industrial Epoxy in Greensboro, NC
Concrete floor coatings sized to your loads, chemicals and cleaning, installed around your schedule.
- Free on-site estimates across Guilford County
- Moisture readings on the slab before we coat it
- Written quote that lists every prep step and coat
Working Floors for Triad Businesses
Commercial & Industrial Epoxy is how many Greensboro businesses turn dusty, stained concrete into a floor that is easy to clean and stands up to work. Commercial epoxy flooring seals the slab, resists oil and many chemicals, brightens the space and lets you mark aisles and safety zones right into the coating. We coat concrete floors in auto shops, warehouses, light manufacturing, commercial kitchens, clinics, retail back rooms, gyms and fire and equipment bays across Guilford County.
A region built on working floors
Greensboro grew as a textile, tobacco and furniture town, and it still has a deep base of industry. Bureau of Labor Statistics figures cited on the city's Wikipedia page count about 54,000 manufacturing jobs in the Greensboro area and about 74,000 in trade, transportation and utilities. FedEx built an air-cargo sorting hub at Piedmont Triad International Airport, HondaJet has a manufacturing facility in Greensboro, Boom Supersonic built a factory at the airport, and Toyota announced a $1.3 billion battery plant in 2021. Volvo Group is one of the area's largest employers, and Mack Trucks and Qorvo are listed among companies based here. Every one of those sectors depends on suppliers, shops and warehouses with concrete floors that take a beating.
Matching the coating to the work
A commercial floor is designed around what happens on it. Forklifts and pallet jacks need a thick, high-solids build and repaired joints so wheels roll across them without chipping. Auto and truck shops need resistance to oil, brake fluid and hot tire marks, plus a texture that stays safe when the floor is wet. Kitchens and food areas face hot water, cleaning chemicals and constant moisture. Clinics and labs want a seamless, easy-to-sanitize surface. We ask about your loads, chemicals, cleaning methods and temperatures before recommending a concrete floor coating.
Industrial prep
Industrial floors often have years of oil, sealers, old paint or failed coatings on them, and many have damaged joints and spalled areas from equipment. Diamond grinding opens the surface and strips out contamination, and then we repair cracks, joints and broken concrete so the coating has a sound base. On slabs that have soaked up oil for years, we degrease and test bond before committing to a system. A moisture test is part of every estimate, because a slab on grade with vapor coming up will push even an expensive coating off the floor.
Planning around your hours
A week-long shutdown is not realistic for most businesses. According to Bob Vila's cost guide, a coating project can mean closing for a day or two, and we build the schedule with that in mind. Big floors can be done in sections so the rest of the building keeps operating, work can happen at night or on weekends when conditions allow, and faster-curing polyaspartic or polyurea layers can go where downtime matters more than material cost. The quote comes with a written schedule showing which areas are closed and when.
Safety markings and color
Coating a commercial floor is the right time to add safety lines, walkways, parking stalls, forklift lanes and hazard zones. Lines laid into the coating itself age along with the floor rather than flaking off the way paint does. Lighter colors brighten a warehouse or shop, which can help visibility on the floor. Anti-slip aggregate can be broadcast in wet areas, ramps and around wash bays.
Commercial epoxy flooring cost
For commercial and industrial 100 percent solids coatings, HomeAdvisor's numbers begin at $12 a square foot and run upward, and small jobs carry a contractor minimum of about $500 to $1,000. HomeGuide puts concrete resurfacing at $3 to $7 per square foot when a damaged slab needs it before coating. The final number depends on square footage, repairs, the system's thickness and any after-hours work, so we quote each building after a walk-through.
Questions we ask before we quote
A good commercial spec starts with good questions. What is the heaviest load that crosses the floor, and on what kind of wheels? Which chemicals reach the floor, and how often: motor oil, hydraulic fluid, acids, sugars, disinfectants? Is the floor washed with hot water or steam? Are there drains, and does water pond anywhere? Does the space get very cold or hot, such as a loading dock door that stays open in winter? Are there inspection or sanitation standards the floor has to meet? How long can each area be closed, and are nights or weekends possible? The answers decide coating thickness, chemical resistance, texture, color and schedule, and they keep you from paying for a system that is more or less than the floor needs.
Keeping a commercial floor in service
Set a cleaning routine that fits the coating: auto scrubbers with the right pads and a neutral cleaner work for most floors. Clean up harsh chemicals quickly, protect the floor under rack feet and machinery, and watch high-wear lanes. A topcoat refresh on worn traffic paths is far cheaper than a full recoat later.
Commercial Floor Systems
We size each system to the work done on the floor.
High-build epoxy
Thick, 100 percent solids epoxy for warehouses, plants and equipment rooms.
Shop and garage bays
Oil- and fluid-resistant coatings with texture for auto, truck and fleet shops.
Fast-return systems
Polyaspartic or polyurea layers for businesses that can only close briefly.
Safety lines and zones
Aisles, walkways, stalls and hazard areas laid into the coating.
Anti-slip finishes
Aggregate broadcast for wet areas, ramps and wash bays.
Joint and slab repair
Cracks, broken joints and spalled concrete rebuilt before coating.
Recoats
Worn coatings scuffed and recoated before they fail through to the concrete.

Typical Commercial Coating Costs
| Item | Published range | Source |
|---|---|---|
| 100% solids coating for commercial/industrial floors, per sq ft | $12 and up | HomeAdvisor, concrete coating |
| Concrete resurfacing, per sq ft | $3 to $7 | HomeGuide, epoxy flooring cost |
| Polyaspartic, 500 sq ft | $2,500 to $6,000 | HomeGuide, polyaspartic cost |
| Polyaspartic, 600 sq ft | $3,000 to $7,200 | HomeGuide, polyaspartic cost |
| Contractor minimum | $500 to $1,000 | HomeAdvisor, concrete coating |
| High-grade coating upgrade | adds 20% to 30% | HomeAdvisor, concrete coating |
Cost guides give national ranges only; commercial work varies widely with size, repairs and scheduling. We walk the building and give you a written estimate, and that estimate is the price.
How a Commercial Project Runs
1. Walk-through
We look at the floor, ask about loads, chemicals and cleaning, and test for moisture.
2. Written scope and schedule
You get a system specification, a price and a phased schedule for closures.
3. Grind and repair
Surfaces are ground, joints and cracks repaired and contamination removed.
4. Coating and markings
Base coats, broadcast, safety lines and topcoats go down in the agreed order.
5. Return to service
We hand back each area with cure times and a cleaning plan for your staff.

Why Choose Us for Commercial & Industrial Epoxy
Built around your operations
We phase work and plan downtime so you are not closed longer than needed.
Spec matched to the floor
Loads, chemicals and cleaning decide the system, not a single standard product.
Repairs priced up front
Joint and slab repairs are listed in the written quote before work starts.
Moisture tested on every slab
Vapor testing is part of every estimate, whatever the floor size.
Commercial & Industrial Epoxy Questions
Which floor is best for industrial use?
For most industrial floors, a thick, high-solids epoxy or a urethane-type system over ground concrete. Industrial 100 percent solids coatings begin at $12 per square foot and go higher, per HomeAdvisor. The right system depends on loads, chemicals and cleaning.
How much downtime should my business plan for?
It depends on size and system. Bob Vila's guide says a business may need to shut for a day or two; working in phases and using fast-curing coatings can cut that down.
Is it possible to coat over old coatings on our floor?
Yes, after we grind off what is failing. Sound old coatings can sometimes be scuffed and recoated, which we check during the walk-through.
Do you add safety lines and markings?
Yes. Aisles, walkways, stalls and hazard areas can be set into the coating itself, so they last as long as the floor does.
Is commercial epoxy flooring slippery?
It does not have to be. We broadcast aggregate into wet areas, ramps and wash bays to add grip.

Commercial & Industrial Epoxy Service Areas
- Epoxy Flooring in Greensboro, NC
- Epoxy Flooring in High Point, NC
- Epoxy Flooring in Jamestown, NC
- Epoxy Flooring in Summerfield, NC
- Epoxy Flooring in Oak Ridge, NC
- Epoxy Flooring in Stokesdale, NC
- Epoxy Flooring in Pleasant Garden, NC
- Epoxy Flooring in Gibsonville, NC
- Epoxy Flooring in Whitsett, NC
- Epoxy Flooring in McLeansville, NC
- Epoxy Flooring in Burlington, NC
- Epoxy Flooring in Elon, NC
- Epoxy Flooring in Graham, NC
- Epoxy Flooring in Mebane, NC
- Epoxy Flooring in Kernersville, NC
- Epoxy Flooring in Winston-Salem, NC
- Epoxy Flooring in Thomasville, NC
- Epoxy Flooring in Archdale, NC
- Epoxy Flooring in Asheboro, NC
- Epoxy Flooring in Reidsville, NC
- Epoxy Flooring in Liberty, NC
- Epoxy Flooring in Clemmons, NC
Get a Commercial & Industrial Epoxy Estimate
Need a working floor that keeps up? Call (336) 962-4282 to book a walk-through.